Temporary off-grid sites, from construction compounds and festival grounds to remote work camps and industrial yards, can run on the sun as well as on fuel. A mobile solar power system brings a ready-built PV array to site, deploys in hours and moves on when the job is done. MPMC’s SPK Series mobile solar plants range from a compact 7.65 kWp unit with automatic expansion to a 231.84 kWp array housed in a 40-foot high-cube container, and pair with MPMC battery storage and generator sets for round-the-clock supply.
The SPK Series Line-Up
SPK arrays use high-efficiency HJT or bifacial panels with MC4 connectors as standard. The SPK-8A expands automatically, ideal for quick set-up on small sites, while the SPK-10 and SPK-20 are manually expanded and ground-installed. For larger loads, the SPK-120 provides 115.92 kWp in a 20HQ container and the SPK-240 provides 231.84 kWp in a 40HQP container, each with a recommended inverter size for straightforward system design.
Containerised SPK-120 and SPK-240 units travel by road and sea in standard container formats and unfold on site, while the compact SPK-8A, weighing 1,100 kg, can be positioned in tight compounds. Every model is designed for repeated deployment, so rental companies and contractors can move arrays from one temporary project to the next.
Table 1. MPMC SPK Series mobile solar plants
Model
Panel type
Total power
Expansion
Rec. inverter
Weight
SPK-8A
HJT 510 Wp
7.65 kWp
Automatic
5 kWe AC
1,100 kg
SPK-10
HJT 480 Wp
10.56 kWp
Manual
8 kWe AC
1,600 kg
SPK-20
Bifacial 590 Wp
21.24 kWp
Manual
16 kWe AC
5,000 kg
SPK-120
Bifacial 630 Wp
115.92 kWp
Manual
80 kWe AC
15,000 kg
SPK-240
Bifacial 630 Wp
231.84 kWp
Manual
180 kWe AC
30,000 kg

MPMC SPK Series container-based mobile solar array, with its panel frames stored inside for transport.
Building a Complete Off-Grid System
Solar Plus Mobile Storage
Solar arrays produce energy by day; battery storage carries it into the night. MPMC’s HBD-R mobile battery storage, from 30 kW / 61.44 kWh to 610 kW / 610.6 kWh, pairs with SPK arrays and with generator sets through compatible controllers. For outdoor daytime events and multi-day festivals, MPMC’s recommended event configuration adds SPK arrays to HBD-R storage and super-silent gensets.
In a UK construction case, adding a 30 kW / 60 kWh HBD-R unit to a 56 kW generator set extended refuelling from every 2 days to every 7 days; adding solar to the same arrangement shifts still more of the daytime load away from fuel.
Solar Plus Storage Plus Generator Set
Where loads run round the clock, a generator set provides firm capacity while solar and storage cut its running hours. MPMC’s EMS uses multi-source data and weather forecasting to maximise solar output, schedule battery charging and start the generator set as demand requires.
For smaller sites that prefer a single unit, MPMC’s GSB hybrid power stations integrate a 2,375 W slide-out solar array, LFP storage and a generator set in one mobile chassis, while larger installations combine SPK arrays with HBD-A storage for industrial yards and campuses. MPMC’s zero-carbon industrial park architecture also uses SPK arrays in open yards and parking areas during construction phases.

MPMC SPK-100 mobile solar array
Where SPK Systems Fit
Table 2. SPK applications for off-grid temporary power
Temporary site
Typical MPMC system
Benefit
Small compound or monitoring post
SPK-8A with HBD-R HBD-30-60
Quick automatic deployment
Construction site offices
SPK-20 with HBD-R and genset
Lower fuel use for welfare loads
Outdoor festivals
SPK arrays with HBD-R and super-silent gensets
Clean daytime energy, silent supply
Industrial yards and campuses
SPK-120 or SPK-240 with HBD-A
Large-scale temporary generation
Remote work camps
SPK with HBD-R or GSB hybrid stations
Solar-first camp power
SPK systems carry a 2-year system warranty, with PV panels and inverters covered by their OEM warranties. Because MPMC also builds battery storage, generator sets, GSB hybrid stations and BCH mobile chargers, buyers can source a complete off-grid system from one supplier, monitored through MPMC’s SCADA platform.
Distributors and PV system integrators, a key MPMC customer group, can offer SPK arrays alongside HBD-E storage with integrated MPPT and an open EMS protocol, building complete solar-storage packages for their own customers.
Planning Mobile Solar Power With MPMC
• Estimate daily energy use and night-time load
• Note available ground area and site duration
• Choose SPK size and matching battery storage
• Decide whether a generator set is needed for firm capacity
• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a mobile solar proposal